Central Maui is positioned to receive additional classroom capacity throughout the region to address the issue of overcrowded facilities serving a growing student demand. These existing issues were exacerbated by the catastrophic Lahaina Wildfire, which effectively displaced thousands of Hawaiian families from West Maui to seek housing options throughout the State and furthered the shortage of school facility capacity. ​
Central Maui By the Numbers
Current Enrollment:​
Intermediate Schools:
2076
High Schools:
3253
Current Capacity:​
Intermediate Schools:
1881
Current capacity conditions suggest that additional intermediate and high school classrooms are needed now*​*:​
​​
Intermediate School: 195 student deficit
​​
​High School: 386 student deficit ​
High Schools:
2867
* calculations from 2023 school year
** calculations assume 18 kids per classroom
Project Phases
-
Budget and Schedule: 10 Years and $249 M
-
Build Multi-Use Facility: Education, Community, Resiliency
-
Build Capacity Existing Schools: 5 Elementary Schools + 2 Intermediate Schools + 2 High Schools
Budget
Biennium
FY22-23
Lapse 06.20.24
FY24-25
Lapse 06.30.26
FY26-27
Lapse 06.30.28
FY28-29
Lapse 06.30.30
FY30-31
Lapse 06.30.32
Appropriatioon
$0 C FY22
$20M C FY23
$10M C FY24
$9M C FY25
$80M C FY26
$60M C FY27
$25M C FY28
$15M C FY29
$20M C FY30
$10M C FY31
Schedule
PHASE I
​Phase I: Central Maui Planning
Lahaina Fires and New Housing
School Standards
-
Educational Specifications
-
Design Guides
-
Construction Specifications
-
Standard Technical Drawings
-
Commissioning Plan
​Phase I: Central Maui Planning
Lahaina Fires and New Housing
School Standards
-
Educational Specifications
-
Design Guides
-
Construction Specifications
-
Standard Technical Drawings
-
Commissioning Plan
​Phase I: Central Maui Planning
Lahaina Fires and New Housing
School Standards
-
Educational Specifications
-
Design Guides
-
Construction Specifications
-
Standard Technical Drawings
-
Commissioning Plan
PHASE II
​Phase II: New Multi-Use Facility
-
Education, Community, and Resiliency
-
Site Identification
-
Standardized Designs
-
Prefabricated Construction
-
New Multi-Use Facility Design
-
Site Build
​Phase II: New Multi-Use Facility
-
Education, Community, and Resiliency
-
Site Identification
-
Standardized Designs
-
Prefabricated Construction
-
New Multi-Use Facility Design
-
Site Build
-
New School Build
Phase II: New Multi-Use Facility
-
Education, Community, and Resiliency
-
Site Identification
-
Standardized Designs
-
Prefabricated Construction
-
New Multi-Use Facility Design
-
Site Build
-
New School Build
PHASE III
​Phase III: Additional Capacity
-
Sites for New Classroom Buildings at Existing Schools
-
Standardized Designs
-
Prefabricated Construction
​Phase III: Additional Capacity
-
Sites for New Classroom Buildings at Existing Schools
-
Standardized Designs
-
Prefabricated Construction
​Phase III: Additional Capacity
-
Sites for New Classroom Buildings at Existing Schools
-
Standardized Designs
-
Prefabricated Construction
* Numbers are subject to change. Please check SFA Plan and Timeline on Modernization Plan page for most recent information.